Anchor
Frame construction in 3 D view. (Left
Picture:) Red: Anchor Tube. Green:
Anchor frame, connecting the
anchor tubes together and secure the position of the anchor
points according to the anchor holes of the base plate.
To
see the different stages of a seismic mass design with anchor
frame construction, vibration isolation, floor plate and X-Y
positioning system for a 6 dof spindle coupled road simulator
please click here.
|